All articles

Haidar Hosamo ·

From Arendalsuka to measurable building performance

What recent industry results reveal about energy savings, measurement and the move from pilots to everyday operation.

5 min read · English

Energy efficiency featured prominently in Arendalsuka 2026. NBBL examined why energy-upgrade projects in existing housing often stall. Another discussion, organised by Tekna, Norsk Industri, SINTEF Energy and Standards Norway, connected more efficient energy use with industrial competitiveness and resilience.12

The practical challenge is to turn that agenda into decisions about real buildings: which intervention to choose, how to operate it, and how to establish whether the improvement persists. Industry updates published in September and October provide useful examples. They also show why the percentage in a headline should begin a technical discussion rather than settle it.

What recent industry results show

Glostrup: heating performance and energy costs

Siemens reports 30% lower heating energy use and 12% lower total energy costs at Glostrup Shopping Centre in Denmark for 1 January–26 August 2026 against the same period in 2025. The project combines Building X with AI-based heating management from Myrspoven.3

Figure 1 separates the consumption and cost outcomes. Each has its own baseline; the percentages are not interchangeable.

Glostrup: heating index falls from 100 to 70; total energy cost from 100 to 88.

Figure 1. Reported changes, with each 2025 baseline indexed to 100. Source: Siemens, October 2026.

Nordborg: integration across the energy system

Danfoss's September update on its Smart Store in Nordborg reports 60% lower net energy use than benchmark stores. The operating supermarket combines refrigeration, heat recovery, controls, monitoring and solar energy. Since opening in 2023, it has used 130 MWh of recovered heat for store heating and hot water, and supplied another 50 MWh to the local district-heating network.4

The result reflects an integrated system; it does not isolate an algorithm's contribution.

Recovered heat: 130 MWh used on site; 50 MWh supplied to district heating.

Figure 2. Cumulative recovered-heat use since 2023, rather than annual savings. Source: Danfoss, September 2026.

Modelling helps define what to test

A September 2026 Schneider Electric whitepaper examines AI-enabled HVAC optimisation using models of offices in Australia, the United States and India. Its published summary reports energy-demand reductions of 9–21% relative to a baseline building management system.5

These scenarios help identify technical potential and formulate field trials. They are model-based evidence, with different assumptions and boundaries from the operating-site reports above. Their results should not be presented as an already demonstrated saving for a Norwegian building portfolio.

A saving needs a defensible comparison

Together, these examples make a useful distinction: heating consumption, total energy expenditure, net site energy and cumulative recovered heat are different quantities. A technology comparison needs consistent boundaries, reporting periods and reference conditions. Ranking the three cases by their headline percentages would obscure those differences.

Weather, occupancy, opening hours and changes in equipment operation can affect consumption. Tariffs and energy prices also affect costs. A year-on-year reduction alone cannot establish how much an individual control intervention contributed.

Established measurement and verification practice offers a basis for a stronger evaluation. The US Department of Energy's FEMP guidance describes documenting baseline conditions and accounting for relevant changes when evaluating performance. Its whole-building approach considers factors such as weather, occupancy, loads and operating conditions.6

A credible evaluation should therefore explain what would reasonably have happened without the intervention. It should document data quality, the comparison method and material changes during the reporting period. Clear uncertainty estimates make the result more useful to an owner deciding whether to invest in the next building.

Where digital twins can contribute

My research interest in digital twins leads to a practical priority: maintaining a traceable connection between the physical building, its operational data and the decisions made about it.

A building information model can provide equipment identities and spatial context. Monitoring can reveal deviations from expected operation. Fault detection can help explain those deviations, while predictive models can assess the likely consequences of changing a schedule, setpoint or maintenance action. Their value becomes visible when a facilities team can identify a problem, take an appropriate action and evaluate the outcome.

For a research–industry pilot, I would make the evaluation plan part of the project from the start. Partners should agree on the energy boundary, baseline period and conditions under which a result will be accepted. They should also decide how comfort, indoor air quality and equipment reliability will be protected while energy performance is improved.

The intervention record matters as much as the model. A change in a ventilation schedule, a repaired valve and a control-software update should be distinguishable in the operational history. That traceability allows researchers and engineers to investigate why a result occurred and whether it is likely to transfer to another site.

Universities can contribute experimental design, uncertainty analysis and methods that can be examined by others. Industry contributes operational knowledge, integration capability and practical constraints. Building owners help define the outcomes that justify adoption. A shared evaluation plan gives these contributions a common purpose.

Scaling requires confidence in everyday operation

The Arendalsuka discussion also showed that implementation involves people and decisions. NBBL's account emphasised early dialogue with residents, understandable financial calculations and linking energy measures to necessary maintenance.1

The same practical discipline belongs in technology projects. An improvement must be understandable to the people who approve it and manageable for those who operate it. Evidence should cover persistence, maintenance effort and performance under changing conditions, alongside the initial energy result.

The recent industry reports give researchers and building owners useful starting points. The next step is to turn those starting points into transparent, repeatable evaluations that help more buildings improve. That is where the energy debate, building research and industrial innovation can meet in practice.

What evidence would help your organisation move from a successful pilot to routine operation?

Sources

  1. NBBL (12 August 2026). Arendalsuka: moving energy projects from planning to implementation.
  2. Arendalsuka 2026 programme (12 August). Energy efficiency, competitiveness and resilience. Organisers: Tekna, Norsk Industri, SINTEF Energy and Standards Norway.
  3. Siemens (20 October 2026). Glostrup Shopping Centre operating results.
  4. Danfoss (21 September 2026). Smart Store: three-year operating update.
  5. Schneider Electric (21 September 2026). AI for Climate: Quantifying the Energy & Carbon Impact of Building Optimization. Whitepaper, document reference Buildings_WP521_EN, and its published summary.
  6. US Department of Energy, FEMP. Measurement and verification options for energy- and water-saving projects, read alongside the FEMP M&V Guidelines, version 5.0 (2024).

Comments (0)

Be the first to join the discussion.

Join the discussion

Your name and comment will appear after approval.